SCAFFOLDING SUPERINTENDANT

France
Site de Construction - Travaux neufs
ASAP
  • Approve the job safety analysis and the method of statement related to the Scaffolding activities
  • In charge of supervising all the Scaffolding works in accordance with site Inspection & test plan.
  • Ensures the compliance of the works performed with the project drawings.
  • Ensures the compliance of the works performed with the Client quality standards
  • Knows and uses project drawings and Client specifications in order to perform the Scope of Work
  • Shall anticipate the works coming (based on the approved S/C schedule and with the construction manager) studying the project drawings in advance, clarifying with the project engineer the potential questions, verifying that the S/C will be ready to perform its works (critical material available, specialized companies or resources mobilized, Methods of statements issued and approved…)
  • Shall ensure that Client free issue items required for its own Scope of Work are delivered in time and make coordination with the Material manager
  • Shall be a safety actor by reporting safety hazardous situation or non conformities
  • Shall stop the works when safety or quality issues are found until corrective action is implemented
  • Performs all the inspections on site as per ITP (with the support of site QA/QC team when required)
  • Updates the own set of project documents (drawings…) with the last revisions issued (paper copies)
  • Is the leader of the S/C weekly meeting and issues the Minutes of Meeting
  • Follows up the detail schedule with S/C, reports any deviation on weekly basis to the site manager and establishes action plan with S/C to recover the delay
  • Performs weekly reviews on the compilation of the quality files (by the S/C) and informs QA/QC manager in case of major deviation found
  • Reviews, comments and supports the QA/QC manager in order to approve the ITP
  • Updates and signs the ITP with the inspection performed
  • Validates on a weekly basis the progress on the Scope of Work through feedbacks to the site manager
  • Supports the site manager in order to track the installed quantity on all the Scope of Work
  • Track the quantities in order to ensure the remeasurement of the scope of work
  • Shall lead tool box with the subcontractor 2 at 3 times by weeks on specific safety or technical points with the support of HSE manager for safety tool box and technical tool box with the site manager
  • Issue to the site manager & project engineer a daily report of activities, problems encountered and actions to be taken