Proactive individuals with project experience ideally in DTC market, OR in Advanced Tech, Oil and Gas or BLS markets.
Technical experience appropriate with the position : vendor, GC or engineering background
Ability to adapt to multiple construction environment & construction teams – multicultural experience.
Demonstrated experience and ability to own a package (scale dependant on role). Accountability is key.
Must come from a strong construction background with the ability to integrate and align with construction teams with a “right first time” approach during the construction period.
A Commitment to Health and Safety principles is critical and will be asked to be demonstrated equally as technical competence.
Ability to drive company and project initiatives and processes.
Ability to operate within an office AND a site with a ‘boots on the ground’ approach.
Responsibilities :
Ensure that all project safety requirements are met and adhered to.
Define the Mechanical objectives (in terms of safety, scope schedule, site management, quality, sub-contractor change control, logistics & site co-ordination) within the project scope & communicate those aims to the relevant sub-contact teams & within the Client.
To be the main point of contact for Mechanical subcontractor site management & be involved with the Mechanical subcontractor selection & procurement process.
To be involved with the project decision making process, to be client facing when required & to create a good working relationship with the Client’s onsite personnel & the Client’s Representatives
To help and support other team members and fully engage in co-ordination exercises.
Work closely with the design team and offer advice and practical solutions on buildability and suitability of existing design solutions
To be able to conclude a project to the Client’s satisfaction including snagging, commissioning, validation & room readiness
To be familiar with and fulfil all the requirements of the Company procedures
Take responsibility for the Set up the site cabins & welfare requirements, ensure water/power/IT/waste services are connected and the site area is kept clean and tidy and to a standard expected of an
Contribution to the generation of & knowledge of the agreed scope of work document for each CSA package.
Contribution to the generation of & knowledge of all the Project Construction Project Execution Plans (CPEP’s) with particular emphasis on the Construction Management CPEP, Logistics CPEP, Project Programming CPEP and Quality CPEP.
To ensure all Requests for Information & Technical submittals issued by the Sub-contracting team on the Mechanical packages are followed up on and answered in a timely manner to ensure progress is not impacted.
To understand and contribute fully to the implementation of Last Planner® methodology onsite. This methodology will form the basis of the lookaheads – where progress against that are fundamental to success in this role.
To keep accurate records and ensure the team also provide detailed accounts of site activities. This includes maintenance of a detailed daily diary that records the execution works of in all area under progress – against the individual activities on the schedule. Recording progress in the diary includes reference to marked up drawings & the daily recording of spent manhours on a per building/level/area/sub-con/Activity ID basis.
General working knowledge of both the Form of Head Contract & Sub-Contract being operated for the project & Mech Packages respectively. To full understand the correct procedures that comply with the contracts for change control, project reporting, defects liability and all other relevant aspects that a CM should be cognisant of in order to ensure contract compliance at all stages of the contract.
To be aware of all the project risks, associated impacts & the necessary mitigations to those risks the Client must manage. To contribute to the project risk log & actively work to close & mitigate all risk but in particular CSA associated risks. The Mechanical CM is a fundamental owner of project risk & this must be reflected in his/her approach to the role
Essential :
BSc in Construction Management/Engineering (civil/struct/mech) – Preferred but not essential
Minimum of 10 years of general construction experience – CM role held previously must include management of minimum €10m of scope on a single project.
Use all recording tools and data to keep an accurate position of the project programme.
All information required for Client and other meetings to be available for review in advance of meetings.